0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: August 2010
Completion: 2013
Status: completed

Project Type

Structure: Tunnel with single lining
Function / usage: High-speed rail tunnel

Location

Location: , ,
, ,
Coordinates: 50° 32' 0" N    10° 59' 29" E
Coordinates: 50° 31' 26" N    10° 59' 33" E
Show coordinates on a map

Technical Information

Dimensions

length 1 051 m

Quantities

volume of extracted material 226 200 m³

Design Loads

design speed 300 km/h

Cost

cost of construction Euro 23 000 000

Participants

Owner

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20064926
  • Published on:
    31/03/2013
  • Last updated on:
    28/05/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine