0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: August 2008
Completion: November 2009
Duration of works: 16 months
Status: in use

Project Type

Structure: Tunnel
Function / usage: Road tunnel

Location

Location: , , ,
Coordinates: 51° 21' 23" N    8° 27' 36" E
Coordinates: 51° 21' 27" N    8° 27' 34" E
Show coordinates on a map

Technical Information

Dimensions

length 123.5 m
clear interior profile 9.50 m x 4.50 - 4.70 m

Quantities

reinforcing steel 245 t
volume of extracted material 13 000 m³
shotcrete 7 700 m³
volume of earthworks 22 000 m³

Cost

cost of construction Euro 5 800 000

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20064778
  • Published on:
    20/03/2013
  • Last updated on:
    25/07/2014
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine