General Information
Status: | in use |
---|
Project Type
Structure: |
Tunnel |
---|---|
Function / usage: |
Railroad (railway) tunnel |
Location
Location: |
Kouilou, Congo Niari, Congo |
---|---|
Part of: | |
Coordinates: | 4° 18' 52.22" S 12° 41' 56.85" E |
Coordinates: | 4° 21' 11.82" S 12° 40' 58.59" E |
Technical Information
Dimensions
length | 4 600 m | |
number of tracks | 1 | |
track gauge | 1 067 mm |
Participants
Co-contractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Géologie du tunnel long du Bamba (Congo). In: Travaux, n. 585 (February 1984), pp. 22-24. (1984):
- Les méthodes de creusement utilisées dans des terrains boulants au Tunnel Long du chemin de fer Congo-Ocean. Presented at: AFTES - Journées techniques, Lyon, 27-29 novembre, 1984, pp. 125-134. (1984):
- Le tunnel de Mayombé (Congo). Présentation générale. In: Travaux, n. 585 (February 1984), pp. 17-21. (1984):
- About this
data sheet - Structure-ID
20009273 - Published on:
13/05/2003 - Last updated on:
01/02/2017