General Information
Other name(s): | Albert II Downhill Tunnel |
---|---|
Beginning of works: | 2012 |
Completion: | 18 July 2016 |
Status: | in use |
Project Type
Function / usage: |
Road tunnel |
---|---|
Structure: |
Tunnel |
Location
Location: |
La Turbie, Alpes-Maritimes (06), Provence-Alpes-Côte d'Azur, France Les Moneghetti, Monaco Cap-d'Ail, Alpes-Maritimes (06), Provence-Alpes-Côte d'Azur, France |
---|---|
Address: | Boulevard du Jardin Exotique / Boulevard Charles III |
Coordinates: | 43° 43' 46.86" N 7° 24' 46.77" E |
Coordinates: | 43° 43' 52.39" N 7° 24' 40.50" E |
Technical Information
Dimensions
width | 10.60 m | |
tunnel length | 1 734.65 m | |
height of vault | 8 m |
Cost
cost of construction | Euro 90 000 000 |
Notes
This is a very unusual tunnel project in as much as the tunnel entrance and exit are located within the principality of Monaco while most of the tunnel itself is located below the territory of the the cities of La Turbie and Cap-d'Ail in France.
Participants
Owner
Client
Design
Checking engineering
Co-contractor
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20033919 - Published on:
03/01/2008 - Last updated on:
28/05/2021