General Information
Completion: | 1997 |
---|---|
Status: | in use |
Project Type
Structure: |
Tunnel |
---|---|
Function / usage: |
Road tunnel |
Location
Location: |
Lyon, Rhône (69), Auvergne-Rhône-Alpes, France |
---|---|
Part of: | |
Coordinates: | 45° 47' 22" N 4° 48' 31" E |
Technical Information
Dimensions
clear interior profile | 7.60 m x 4.50 m | |
depth | min. 15 m | |
total excavated section | 70 m² | |
number of tubes | 2 | |
eastern tube | length | 358 m |
western tube | length | 518 m |
Materials
tunnel structure |
un-reinforced concrete
|
---|
Participants
Owner
Client
Co-contractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Boulevard périphérique Nord de Lyon. La maîtrise d'oeuvre des tunnels de La Duchère et de Rochecardon. Presented at: AFTES - Journées d'études, Chambéry, 1996, pp. 185-192. (1996):
- GIE Lyon Nord. Projet ouest - I - Les tunnels de La Duchère et de Rochecardon. In: Travaux, n. 723 (September 1996), pp. 34-38. (1996):
- About this
data sheet - Structure-ID
20008526 - Published on:
08/03/2003 - Last updated on:
28/05/2021