General Information
Completion: | 1922 |
---|---|
Status: | in use |
Project Type
Structure: |
Girder bridge |
---|---|
Function / usage: |
Road bridge |
Material: |
Reinforced concrete bridge |
Location
Location: |
Patangata, Hawkes Bay, New Zealand |
---|---|
Coordinates: | 39° 54' 39.08" S 176° 43' 46.20" E |
Technical Information
Dimensions
span lengths | 24 x 15.9 m | |
number of spans | 24 |
Materials
deck |
reinforced concrete
|
---|
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Bridging the Gap. Early Bridges in New Zealand 1830-1939. Reed Books, Auckland (New Zealand), pp. 76. (2001):
- About this
data sheet - Structure-ID
20052167 - Published on:
16/01/2010 - Last updated on:
30/12/2019