General Information
Name in local language: | Jembatan Tuanku Tambusai; Jembatan 5 Barelang |
---|---|
Other name(s): | Barelang 5 Bridge |
Completion: | 1997 |
Status: | in use |
Project Type
Structure: |
Deck arch bridge |
---|---|
Function / usage: |
Road bridge |
Construction method: |
Cantilever construction using temporary cable-stays |
Material: |
Reinforced concrete bridge |
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Support conditions: |
for registered users |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Rempang Island, Riau Islands, Indonesia Galang Island, Riau Islands, Indonesia |
---|---|
Part of: | |
Coordinates: | 0° 46' 59.14" N 104° 10' 33.33" E |
Technical Information
Dimensions
total length | 385 m | |
clearance | 27 m | |
number of lanes | 2 | |
arch | arch span | 245 m |
deck | span lengths | 11 x 35 m |
deck width | 18 m | |
number of spans | 11 |
Materials
piers |
reinforced concrete
|
---|---|
arch |
reinforced concrete
|
abutments |
reinforced concrete
|
piers on arch |
reinforced concrete
|
Participants
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- The Barelang bridge in Indonesia. Presented at: ARCH'01. 3ème conférence sur les ponts en arc, pp. 923-927. (2001):
- Le pont en arc de Barelang (Indonésie). Barelang arch bridge (Indonesia). Presented at: La Technique française du béton, XIIIe congrès de la FIB, Amsterdam 1998, pp. 327. (1998):
- Pont en arc de Barelang V - Indonésie. Presented at: , pp. 97-100. :
- About this
data sheet - Structure-ID
20003516 - Published on:
10/06/2002 - Last updated on:
18/01/2024