General Information
Other name(s): | Tsing Tsuen Bridge |
---|---|
Completion: | 10 December 1987 |
Status: | in use |
Project Type
Structure: |
Haunched girder bridge |
---|---|
Material: |
Prestressed concrete bridge |
Function / usage: |
Road bridge |
Structure: |
Box girder bridge |
Construction method: |
Balanced cantilever method |
Location
Location: |
Tsing Yi, Kwai Tsing, Hong Kong, China |
---|---|
Coordinates: | 22° 21' 36.40" N 114° 6' 36.43" E |
Technical Information
Dimensions
main span | 160 m |
Participants
Relevant Web Sites
Relevant Publications
- Une opération originale de descente d'ouvrage réalisée sur le pont Tsing Yi Nord (Hong Kong). Presented at: La Technique Française du Béton, XIe Congrès de la FIP Hambourg 1990, pp. 269-272. (1990):
- Tsing Yi North Bridge: Construction. In: Proceedings of the Institution of Civil Engineers, v. 86, n. 3 (June 1989), pp. 491-511. (1989):
- Tsing Yi North Bridge: Planning and Design. In: Proceedings of the Institution of Civil Engineers, v. 86, n. 3 (June 1989), pp. 471-489. (1989):
- About this
data sheet - Structure-ID
20067035 - Published on:
18/05/2015 - Last updated on:
05/02/2016