• DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Trollhättan Lift Bridge

General Information

Beginning of works: 1999
Completion: 9 November 2001
Status: in use

Project Type

Structure: Vertical lift bridge
Function / usage: Railroad (railway) bridge
Material: Steel bridge

Location

Location: , ,
Near: Trollhättan Fixed Bridge (2001)
Coordinates: 58° 17' 29.76" N    12° 17' 31.53" E
Show coordinates on a map

Technical Information

Dimensions

tower height ca. 40 m
span 49.6 m
clearance 27 m

Quantities

structural steel 530 t

Materials

towers reinforced concrete
truss steel

Chronology

9 November 2001

Inauguration.

Advertisement

Participants

Owner
Client
Architecture
Consulting engineers
Subconsultant
Main contractor
Steel construction
Cable inspection (2013-2014)
Inspection services

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20008490
  • Date created
    06/03/2003
  • Last Update
    04/05/2016