0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1991
Completion: 1995
Status: in use

Project Type

Location

Location: ,
Coordinates: 60° 40' 0" N    3° 40' 0" E
Show coordinates on a map

Technical Information

Dimensions

weight 656 000 t
total height 472 m

Quantities

concrete volume 245 000 m³
reinforcing steel 100 000 t

Chronology

July 1991

Construction of the base is begun.

August 1992

Construction of the deck begins.

December 1994

Deck is completed.

3 January 1995

Deck is floated to the gravity base structure in Ykjesfjorden.

Participants

Owner
Construction
Prestressing
(role unknown)

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20003286
  • Published on:
    19/05/2002
  • Last updated on:
    20/11/2017
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine