• DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Share

Follow

Trinity Chain Pier

General Information

Completion: 14 August 1821
Status: collapsed (18 October 1898)

Project Type

Structure: Chain suspension bridge
Function / usage: Pier
Material: Iron bridge

Location

Location: , ,
Coordinates: 55° 58' 55.88" N    3° 12' 22.41" W
Show coordinates on a map

Technical Information

Dimensions

width 1.2 m
total length 210 m

Materials

chains wrought iron
deck flooring wood

Advertisement

Participants

Design

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20008327
  • Date created
    18/02/2003
  • Last Update
    07/12/2016