General Information
Completion: | 11 September 2003 |
---|---|
Status: | in use |
Project Type
Structure: |
Twin girder bridge |
---|---|
Function / usage: |
Road bridge |
Material: |
Steel-reinforced concrete composite bridge |
Location
Location: |
Triel-sur-Seine, Yvelines (78), Ile-de-France, France Vernouillet, Yvelines (78), Ile-de-France, France |
---|---|
Crosses: |
|
Coordinates: | 48° 58' 4" N 2° 0' 4" E |
Technical Information
Dimensions
total length | 635 m | |
span lengths | 73 m - 105 m - 3 x 124 m - 85 m | |
number of spans | 6 | |
total width | 22.92 m |
Quantities
structural steel | 4 200 t | |
concrete volume | 2 800 m³ | |
reinforcing steel | 4 400 t |
Materials
girder |
steel
|
---|---|
deck slab |
reinforced concrete
|
Participants
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Franchissement de la Seine. Un pont mixte entre Triel et Vernouillet. In: Travaux, n. 774 (April 2001), pp. 51-56. (2001):
- Mise en service du nouveau pont de Triel-sur-Seine. In: Le Moniteur des Travaux Publics et du Bâtiment, n. 5208 (19 September 2003), pp. 28. (2003):
- About this
data sheet - Structure-ID
20008238 - Published on:
14/02/2003 - Last updated on:
05/02/2016