0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Completion: 1881
Status: demolished

Project Type

Location

Location: , ,
Part of:
Replaced by: Trezoi Bridge

Technical Information

There currently is no technical data available.

Chronology

Middle of the 20th century

The bridge is replaced by a new structure, also a truss bridge.

Participants

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • Loyrette, Henri (1986): Gustave Eiffel. Payot, Paris (France), pp. 73.
  • About this
    data sheet
  • Structure-ID
    20005884
  • Published on:
    03/10/2002
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine