General Information
Completion: | 1997 |
---|---|
Status: | in use |
Project Type
Structure: |
Tunnel |
---|---|
Function / usage: |
Road tunnel |
Construction method: |
Cut-and-cover method |
Location
Location: |
Lyon, Rhône (69), Auvergne-Rhône-Alpes, France |
---|---|
Part of: | |
Connects to: |
Tunnel de la Duchère (1997)
|
Coordinates: | 45° 46' 48" N 4° 47' 48" E |
Technical Information
Dimensions
length | 194 m | |
clearance | 4.50 m | |
number of lanes | 2 x 3 | |
thickness of median support | 0.50 m | |
thickness of exterior walls | 0.50 - 0.80 m | |
Distance between median and exterior walls | 11 - 17 m | |
height of walls above foundation slab | 6.60 m | |
depth of ceiling slabs | 60 cm; 80 cm; 100 cm |
Materials
tunnel structure |
reinforced concrete
|
---|
Participants
Owner
Client
Checking engineering
Co-contractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- GIE Lyon Nord. Projet ouest - II - La tranchée de Vaise. In: Travaux, n. 723 (September 1996), pp. 39-42. (1996):
- About this
data sheet - Structure-ID
20008510 - Published on:
07/03/2003 - Last updated on:
29/07/2014