0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Completion: 1822
Status: in use

Project Type

Structure: Vaulted arch bridge
Material: Masonry bridge
Function / usage: current use:
Pedestrian bridge (footbridge)

Location

Location: , , , ,
Crosses:
  • Avon
Coordinates: 52° 11' 28.11" N    1° 42' 5.38" W
Show coordinates on a map

Technical Information

Dimensions

number of arches 8

Materials

arches brick

Participants

Engineering

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20073782
  • Published on:
    21/09/2017
  • Last updated on:
    21/11/2022
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine