General Information
Other name(s): | Yahai River Bridge; Yahagigawa Bridge |
---|---|
Beginning of works: | 2001 |
Completion: | March 2005 |
Status: | in use |
Project Type
Structure: |
Cable-stayed bridge with semi-fan system |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Material: |
Steel-prestressed concrete composite bridge Structurae Plus/Pro - Subscribe Now! Structurae Plus/Pro - Subscribe Now! |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Location
Technical Information
Dimensions
total length | 820 m | |
main spans | 2 x 235 m | |
span lengths | 174.400 m - 2 x 235.000 m - 174.400 m | |
number of spans | 4 | |
number of lanes | 2 x 4 | |
deck | width | 43.8 - 47.167 m |
pylons | height | 109.6 m |
Materials
piers |
reinforced concrete
|
---|---|
pylons |
reinforced concrete
|
deck slab |
prestressed concrete
|
bottom flange |
prestressed concrete
|
webs |
corrugated steel
|
Participants
Design
Co-contractor
- Kajima Corporation (Western bridge)
- Kawada Industries (Eastern bridge)
- Oriental Construction Co. (Eastern bridge)
- Sumitomo Construction (Western bridge)
- Taisei Construction (Eastern bridge)
- Yokogawa Bridge Corporation (Western bridge)
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Webbed feat. In: Bridge Design & Engineering, v. 10, n. 35 (2nd Quarter 2004), pp. 34-35. (2004):
- About this
data sheet - Structure-ID
20012432 - Published on:
04/07/2004 - Last updated on:
05/01/2018