General Information
Project Type
Structure: |
Cable-stayed bridge with semi-fan system Three-span cable-stayed bridge |
---|---|
Material: |
Steel bridge |
Function / usage: |
Road bridge |
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! Structurae Plus/Pro - Subscribe Now! |
Location
Technical Information
Dimensions
total length | 561.40 m | |
span lengths | 60.000 m - 80.50 m - 216.00 m - 80.50 m - 2 x 60.000 m - 29.000 m | |
deck width | 19.10 m | |
number of spans | 3 | |
deck | deck depth | 3.10 m |
pylons | pylon height | 34.873 m |
number | 2 |
Cost
cost of construction | Japanese yen 2 680 000 000 |
Materials
deck |
steel
|
---|---|
piers |
reinforced concrete
|
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Aerodynamic behaviour of cable stayed bridge Toyosato Ohhashi. Presented at: Ninth Congress of IABSE = Neuvième Congrès de l'AIPC = Neunter Kongress der IVBH, Amsterdam, Netherlands, 8-13 May 1972. (1972):
- Design and Construction of Toyosato-Ohhashi Bridge. In: Stahlbau, v. 41, n. 6 (June 1972), pp. 181-189. (1972):
- Schrägseilbrücken. Wilhelm Ernst & Sohn Verlag für Architektur und technische Wissenschaften GmbH, Berlin (Germany), pp. 33. (1986):
- About this
data sheet - Structure-ID
20006307 - Published on:
16/10/2002 - Last updated on:
12/11/2017