General Information
Project Type
Function / usage: |
Motorway bridge / freeway bridge |
---|---|
Construction method: |
Balanced cantilever method |
Material: |
Prestressed concrete bridge |
Structure: |
Rigid frame bridge with V-shaped legs |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Salamanca, Salamanca, Castile-Leon, Spain |
---|---|
Address: | A-62 |
Crosses: |
|
Coordinates: | 40° 57' 32.36" N 5° 42' 16.35" W |
Technical Information
Dimensions
total length | 201.40 m | |
span lengths | 50.00 m - 100.00 m - 50.00 m | |
number of spans | 3 | |
deck | deck depth | 2.20 - 5.25 m |
deck width | 2 x 13.50 m | |
total width | 28.00 m |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Experiencias en puentes construidos por el sistema de avance en voladizo sucesivo. In: Hormigón y acero, v. 42, n. 180 (3rd Quarter 1991), pp. 109-118. (1991):
- About this
data sheet - Structure-ID
20072972 - Published on:
08/05/2017 - Last updated on:
06/11/2018