General Information
Status: | in use |
---|
Project Type
Structure: |
Half-through arch bridge |
---|---|
Material: |
Concrete-filled steel tube (CFST) bridge |
Function / usage: |
Road bridge |
Location
Technical Information
Dimensions
total length | 292 m | |
arch span | 238 m |
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Design and construction of Tongwamen Bridge, China. In: Proceedings of the Institution of Civil Engineers - Bridge Engineering, v. 157, n. 1 (March 2004), pp. 1-7. (2004):
- About this
data sheet - Structure-ID
20067845 - Published on:
06/10/2015 - Last updated on:
05/02/2016