0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 10 October 2018
Completion: 22 February 2019
Status: in use

Project Type

Location

Location: , ,
Location description: The bridge crosses the Manafwa river.
Coordinates: 1° 56' 16.38" N    34° 16' 8.76" E
Show coordinates on a map

Technical Information

Dimensions

span 74.8 m

Materials

cables steel wire
pylons steel
anchorages reinforced concrete
deck flooring Mugavu

Notes

The bridge built by Bridges to Prosperity serves around 3000 people in the communities of Bubitumu and Bumulekhwa.

Participants

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20084674
  • Published on:
    27/01/2023
  • Last updated on:
    27/01/2023
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine