0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 18 April 2010
Completion: 28 June 2015
Status: in use

Project Type

Function / usage: High-speed rail bridge
upper deck:
Motorway bridge / freeway bridge
Structure: lower deck:
Three-span cable-stayed bridge

Location

Location: , ,
Crosses:
  • Yangtze River
Coordinates: 31° 5' 2.91" N    117° 58' 8.25" E
Show coordinates on a map

Technical Information

Dimensions

main span 630 m
total length 16 719 m
pylons height 212 m

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20072517
  • Published on:
    27/01/2017
  • Last updated on:
    07/03/2017
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine