General Information
Completion: | 1991 |
---|---|
Status: | in use |
Project Type
Structure: |
Cable-stayed bridge with harp system |
---|---|
Material: |
Prestressed concrete bridge |
Function / usage: |
Motorway bridge / freeway bridge |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Location
Technical Information
Dimensions
main span | 185.000 m | |
total length | 785.000 m | |
span lengths | 92.500 m - 185.000 m - 92.500 m - 72.000 m - 2 x 100.000 m - 68.000 m - 55.000 m | |
number of spans | 8 | |
deck | deck width | 18.350 m |
pylon | pylon height | 81.750 m |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
pylons |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Design and construction of Tomei-Ashigara Bridge. Presented at: IABSE Symposium: Bridges - Interaction between construction technology and design, Leningrad, USSR, 1991, pp. 247-252. (1991):
- About this
data sheet - Structure-ID
20006614 - Published on:
07/11/2002 - Last updated on:
02/01/2018