General Information
Completion: | 1986 |
---|---|
Status: | in use |
Project Type
Structure: |
T-section girder bridge |
---|---|
Construction method: |
Precast girders with cast-in-situ slab |
Material: |
Prestressed concrete bridge |
Location
Location: |
Turkey |
---|---|
Crosses: |
|
Technical Information
Dimensions
total length | 517.50 m | |
span lengths | 15 x 34.50 m | |
number of spans | 15 | |
height above valley floor or water | 28.37 m |
Materials
deck slab |
reinforced concrete
|
---|---|
girders |
precast prestressed concrete
|
Participants
Design
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Les grands ponts du monde: Hors d'Europe. Brissaud, Poitiers (France), pp. 214. (1990):
- About this
data sheet - Structure-ID
20007051 - Published on:
02/12/2002 - Last updated on:
02/01/2018