General Information
Project Type
Structure: |
Half-through arch bridge |
---|---|
Function / usage: |
Road bridge |
Material: |
Steel-reinforced concrete composite bridge |
Awards and Distinctions
2020 |
entry
for registered users |
---|
Location
Location: |
Raguhn-Jeßnitz, Anhalt-Bitterfeld, Saxony-Anhalt, Germany |
---|---|
Carries: |
|
Crosses: |
A 9 Motorway (Germany)
|
Coordinates: | 51° 42' 27.24" N 12° 12' 44.17" E |
Technical Information
Dimensions
width | 16.35 m | |
total length | 63.50 m | |
span lengths | 11.00 m - 42.00 m - 10.50 m | |
number of spans | 3 | |
bridge surface | 1 038 m² | |
arches | width | 1.00 m |
deck | deck depth | 1.20 m |
Quantities
structural steel | 500 t | |
concrete volume | 1 810 m² | |
reinforcing steel | 330 t | |
shear studs | 11 t |
Cost
cost of construction | ca. Euro 3 850 000 |
Materials
deck |
composite steel-reinforced concrete
|
---|---|
arches |
steel
|
abutments |
reinforced concrete
|
Participants
Owner
Client
Design
Structural engineering
Co-contractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Chronik des Brückenbaus. In: (2018): 28. Dresdner Brückenbausymposium. Institut für Massivbau, Technische Universität Dresden, Dresden (Germany), ISBN 978-3-86780-544-5, pp. 215-230. (2018):
- About this
data sheet - Structure-ID
20074898 - Published on:
19/03/2018 - Last updated on:
19/03/2018