0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Official designation: BW 121A
Beginning of works: 2016
Completion: 2017
Status: in use

Project Type

Awards and Distinctions

2020 entry  

Location

Location: , , ,
Carries:
  • Bundesstrasse B 6
Crosses: A 9 Motorway (Germany)
Coordinates: 51° 42' 27.24" N    12° 12' 44.17" E
Show coordinates on a map

Technical Information

Dimensions

width 16.35 m
total length 63.50 m
span lengths 11.00 m - 42.00 m - 10.50 m
number of spans 3
bridge surface 1 038 m²
arches width 1.00 m
deck deck depth 1.20 m

Quantities

structural steel 500 t
concrete volume 1 810 m²
reinforcing steel 330 t
shear studs 11 t

Cost

cost of construction ca. Euro 3 850 000

Materials

deck composite steel-reinforced concrete
arches steel
abutments reinforced concrete

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • Wellner, Sabine (2018): Chronik des Brückenbaus. In: Curbach, Manfred (2018): 28. Dresdner Brückenbausymposium. Institut für Massivbau, Technische Universität Dresden, Dresden (Germany), ISBN 978-3-86780-544-5, pp. 215-230.
  • About this
    data sheet
  • Structure-ID
    20074898
  • Published on:
    19/03/2018
  • Last updated on:
    19/03/2018
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine