0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 2005
Completion: 2008
Status: in use

Project Type

Structure: Tied-arch bridge
Function / usage: Road bridge
Material: Reinforced concrete bridge

Awards and Distinctions

2010 award winner  

Location

Location: , , ,
Crosses:
  • Ebro River
Coordinates: 41° 39' 56" N    0° 54' 30" W
Show coordinates on a map

Technical Information

Dimensions

total length 270 m
arch span 216 m
arch rise 36 m
deck width 43 m
number of lanes 2 x 3

Cost

cost of construction Euro 22 800 000

Materials

deck reinforced concrete
arch reinforced concrete

Case Studies and Applied Products

Delicate hydraulic crown jacking procedure shapes the concrete bowstring arch of Zaragoza’s Third Millenium Bridge

Delicate hydraulic crown jacking procedure shapes the concrete bowstring arch of Zaragoza’s Third Millenium Bridge

Two thousand years after the Romans built for some of history’s most celebrated arches, one of their ancient cities has given rise to a new engineering feat that reflects their triumphs. The Third Millenni ... [more]

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

More publications...
  • About this
    data sheet
  • Structure-ID
    20011063
  • Published on:
    28/12/2003
  • Last updated on:
    01/09/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine