General Information
Completion: | 1995 |
---|---|
Status: | in use |
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
Road bridge |
Construction method: |
Balanced cantilever method |
Structure: |
Haunched girder bridge |
Material: |
Prestressed concrete bridge |
Location
Technical Information
Dimensions
span lengths | 45 m - 3 x 70 m - 45 m | |
number of spans | 5 |
Materials
deck |
prestressed concrete
|
---|
Participants
Design
Relevant Web Sites
- About this
data sheet - Structure-ID
20033078 - Published on:
05/11/2007 - Last updated on:
05/02/2016