General Information
Completion: | 1924 |
---|---|
Status: | in use |
Project Type
Function / usage: |
Below grade metro or light-rail station |
---|---|
Structure: |
Underground structure |
Location
Location: |
Manhattan, New York, New York, USA |
---|---|
Part of: | |
Coordinates: | 40° 43' 59.52" N 73° 59' 13.92" W |
Technical Information
There currently is no technical data available.
Excerpt from Wikipedia
Third Avenue is a station on the BMT Canarsie Line of the New York City Subway. Located at the intersection of Third Avenue and East 14th Street in East Village, Manhattan, it is served by the L train at all times.
History
This station opened on June 30, 1924, as part of the 14th Street–Eastern Line, which ran from Sixth Avenue under the East River and through Williamsburg to Montrose and Bushwick Avenues.
Station layout
This station has two side platforms, which are 500 feet (150 m) long, and two tracks. West of the station there is a double crossover. The platforms are column-less and have the standard BMT style trim-line and name tablets. The former contains "3" tablets in standard intervals while the latter consists of "THIRD AVE" in Times New Roman typeface.
There are also directions signs to the station's only entrances/exits saying "TO STREET" in the same style as the name tablets. Each platform has its own same-level fare control at the extreme west (railroad north) end. As a result, there is no free transfer between directions. This station is identical to the next one east (railroad south), First Avenue except that the fare control areas there are at a small mezzanine above the platforms.
Third Avenue is one of only two stations along the Canarsie Line in Manhattan that does not contain a transfer to another line. The other station is the nearby First Avenue Subway station. However, a transfer station is planned to the 14th Street station of the Second Avenue Subway, as part of Phase 3 of construction from 55th Street to Houston Street.
Exits
Each platform-level fare control area has a bank of turnstiles, token booth, and two street stairs apiece—one to the east side of Third Avenue and East 14th Street, the other to East 14th Street just east of Third Avenue. The stairs on the Eighth Avenue-bound side lead to the northeast corner while the ones on the Brooklyn-bound side lead to the southeast corner.
Experimental platform doors
As part of a pilot program, the station was supposed be refitted with 32 half-height platform screen doors (PSDs) while the 14th Street Tunnel is rebuilt from April 2019 to March 2020. This had been possible as a result of the L train's automated train operation, as well as the route's exclusive use of 60-foot-long (18 m) subway cars with four doors, which allow trains to stop at the same part of the platform every time. The MTA would have used the results of the pilot in order to determine the feasibility of adding such doors citywide. The PSDs would have been approximately 54 inches (140 cm) high and would have been coordinated with the location of the subway car doors when a train was in the station.
To ensure that the subway car is precisely lined up with the doors, a wayside-only berthing system would be installed. Emergency egress gates would be installed in between the regular doors to allow people to exit in the case of an emergency. The platform edges and topping would be removed and replaced so that they align with the sills of the train doors and to be in compliance with the Americans with Disabilities Act of 1990. To ensure that people do not get trapped in between the subway car doors and the PSDs, sensors and CCTV cameras would be installed with monitors at the center and front of the platforms visible to the train operator and conductor.
In June 2018, the $30 million for the platform edge door pilot program was diverted to another project along the Canarsie Line: the installation of elevators at the Sixth Avenue station. The pilot program was postponed until sufficient funding could be found.
Text imported from Wikipedia article "Third Avenue station (BMT Canarsie Line)" and modified on June 2, 2020 according to the CC-BY-SA 4.0 International license.
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
- About this
data sheet - Structure-ID
20055678 - Published on:
22/03/2010 - Last updated on:
20/05/2022