General Information
Project Type
Function / usage: |
Sewer |
---|---|
Construction method: |
Tunnel boring machine (TBM) |
Structure: |
Tunnel |
Location
Location: |
London, England, United Kingdom |
---|---|
Coordinates: | 51° 31' 14.27" N 0° 4' 28.23" E |
Coordinates: | 51° 30' 11.94" N 0° 15' 20.50" W |
Technical Information
Dimensions
length | 25 km | |
depth | 30 - 70 m | |
interior diameter | 7.2 m |
Cost
cost of construction | Pound sterling 4 300 000 000 |
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
Relevant Publications
- BIM model-based design delivery: Tideway East, England, UK. In: Proceedings of the Institution of Civil Engineers - Smart Infrastructure and Construction, v. 170, n. 3 (September 2017), pp. 50-58. (2017):
- Effects of changing geology on the performance of a tunnel boring machine for the Thames Tideway Tunnel, London, UK. In: Proceedings of the Institution of Civil Engineers - Geotechnical Engineering, v. 176, n. 6 (December 2023), pp. 1-14. (2023):
- Ensuring Health, Safety and Well-Being on the UK’s Thames Tideway Tunnel Programme. In: Proceedings of the Institution of Civil Engineers - Civil Engineering, v. 175, n. 2 (May 2022), pp. 1-8. (2022):
- Impact of Covid-19 on tunnelling operations for the Thames Tideway Tunnel, UK. In: Proceedings of the Institution of Civil Engineers - Civil Engineering, v. 175, n. 5 (May 2022), pp. 1-8. (2022):
- Life-cycle assessment applied to construction of Thames Tideway east tunnel, London, UK. In: Proceedings of the Institution of Civil Engineers - Engineering Sustainability, v. 172, n. 8 (December 2019), pp. 416-423. (2019):
- About this
data sheet - Structure-ID
20082981 - Published on:
29/05/2022 - Last updated on:
22/03/2024