General Information
Project Type
Structure: |
Deck truss bridge |
---|---|
Function / usage: |
Road bridge |
Support conditions: |
for registered users |
Structure: |
Continuous truss bridge |
Material: |
Steel bridge |
Support conditions: |
for registered users |
Awards and Distinctions
Location
Location: |
Berlin-Tempelhof, Tempelhof-Schöneberg, Berlin, Germany Berlin-Mariendorf, Tempelhof-Schöneberg, Berlin, Germany |
---|---|
Address: | Ringstraße |
Crosses: |
|
Crosses: |
Teltow Canal (1906)
|
Coordinates: | 52° 26' 46.23" N 13° 21' 57.23" E |
Technical Information
Dimensions
Initial construction | ||
---|---|---|
width | 13 m | |
Widening | ||
width | 22 m |
Materials
truss |
steel
|
---|
Participants
Design
- Christian Havestadt (designer)
- Max Contag (designer)
Relevant Web Sites
- About this
data sheet - Structure-ID
20020017 - Published on:
15/03/2006 - Last updated on:
29/05/2023