General Information
Completion: | 2004 |
---|---|
Status: | in use |
Project Type
Function / usage: |
Road bridge |
---|---|
Structure: |
Piston-stayed bridge |
Location
Location: |
Tervate, West Flanders, Flanders, Belgium |
---|---|
Coordinates: | 51° 4' 52.09" N 2° 50' 29.74" E |
Technical Information
Dimensions
total length | 38 m | |
length of movable section | 16 m |
Participants
Relevant Web Sites
Relevant Publications
- Laurent Ney - Shaping Forces. Bozar Books - A+ Editions, Brussels (Belgium), ISBN 9789490814007, pp. 191. (2010):
- (2008): Piston stayed bascule bridge: a novel mobile bridge typology at Temse, Belgium. Presented at: 17th IABSE Congress: Creating and Renewing Urban Structures – Tall Buildings, Bridges and Infrastructure, Chicago, USA, 17-19 September 2008, pp. 260-261.
- The Piston-Stayed Bridge. A Novel Typology for a Mobile Bridge at Tervate, Belgium. In: Structural Engineering International, v. 17, n. 4 (November 2007), pp. 302-305. (2007):
- About this
data sheet - Structure-ID
20018269 - Published on:
01/11/2005 - Last updated on:
05/02/2016