General Information
Other name(s): | Takamatu Bridge |
---|---|
Beginning of works: | 14 March 1996 |
Completion: | 5 July 2000 |
Status: | in use |
Project Type
Structure: |
Deck arch bridge |
---|---|
Construction method: |
Cantilever construction using temporary cable-stays |
Material: |
Prestressed concrete bridge |
Function / usage: |
Road bridge |
Location
Technical Information
Dimensions
total length | 463.2 m | |
arch span | 260 m | |
total width | 8.75 m | |
roadway / carriageway width | 6.25 m |
Materials
deck |
prestressed concrete
|
---|---|
arch |
reinforced concrete
|
piers on arch |
reinforced concrete
|
Participants
Co-contractor
Relevant Web Sites
Relevant Publications
- Design and construction of the Tensho concrete arch bridge. Presented at: ARCH'01. 3ème conférence sur les ponts en arc, pp. 857-864. (2001):
- Takamatu Bridge. In: VSL News, v. 11, n. 1 ( 2000), pp. 12. (2000):
- About this
data sheet - Structure-ID
20004197 - Published on:
05/07/2002 - Last updated on:
19/11/2019