0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 2014
Completion: 2016
Duration of works: 1 years 11 months
Status: in use

Project Type

Function / usage: Flood-control dam
Structure: Mobile barrage

Location

Location: , , ,
Impounds:
  • Salt River
Replaces: Tempe Town Lake Inflatable Dam (1999)
Coordinates: 33° 26' 1.29" N    111° 56' 57.74" W
Show coordinates on a map

Technical Information

There currently is no technical data available.

Participants

Structural engineering
Contractor
Steel construction
Concrete supplier

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20074537
  • Published on:
    09/01/2018
  • Last updated on:
    15/01/2018
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine