General Information
Completion: | 7 March 1999 |
---|---|
Status: | in use |
Project Type
Function / usage: |
Metro or rapid transit system |
---|
Location
km | Name |
Technical Information
Dimensions
number of stations | 162 | |
system length | 179.2 km | |
track gauge | 1 435 mm |
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Les activités de la SOFRETU en matiere de métro. Le métro de Téhéran. Presented at: AFTES - Journées d'études, Paris, 9-11 mai 1977, pp. 192-193.
- Evaluation of tool wear in EPB tunneling of Tehran Metro, Line 7 Expansion. In: Tunnelling and Underground Space Technology, v. 61 (January 2017), pp. 233-246. (2017):
- (2018): Geotechnical Challenges of Tehran Metro Line 7 (South Northern Route). In: Civil Engineering Journal, v. 4, n. 5 (June 2018), pp. 1117.
- Numerical modeling of ground settlement control of large span underground metro station in Tehran Metro using Central Beam Column (CBC) structure. In: Tunnelling and Underground Space Technology, v. 28 (March 2012), pp. 1-9. (2012):
- Tunneling-induced ground movements on Tehran Metro. In: Soil Mechanics and Foundation Engineering, v. 49, n. 4 (September 2012), pp. 132-138. (2012):
- About this
data sheet - Structure-ID
10058739 - Published on:
01/11/2010 - Last updated on:
24/10/2023