General Information
Completion: | 2006 |
---|---|
Status: | in use |
Project Type
Structure: |
Cable-stayed bridge with semi-fan system |
---|---|
Material: |
Timber bridge |
Function / usage: |
Bicycle and pedestrian bridge |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Location
Technical Information
Materials
cross beams |
steel
|
---|---|
stay cables |
steel wire
|
deck flooring |
wood
|
main girders |
glued laminated timber (glulam)
|
Participants
Design
- Michael Flach (designer)
Structural engineering
- Hofmann + Resch + Exenberger ZT-Gesellschaft für Bauwesen (superstructure)
- Karl Prantl (structural engineer) (substructure)
Civil works
Timber construction
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Lechtal, Tal der Holzbrücken. Methodisches Vorgehen beim Entwurf. In: Brückenbau, v. 1, n. 3 ( 2009), pp. 6-9. (2009):
- About this
data sheet - Structure-ID
20052056 - Published on:
14/01/2010 - Last updated on:
05/02/2016