General Information
Completion: | 1936 |
---|---|
Status: | in use |
Project Type
Function / usage: |
Road bridge |
---|---|
Structure: |
Deck arch bridge |
Material: |
Reinforced concrete bridge Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Hawera, Taranaki, New Zealand |
---|---|
Address: | SH 3 |
Coordinates: | 39° 37' 5.66" S 174° 20' 38.04" E |
Technical Information
Dimensions
number of spans | 5 | |
arch span | 27.4 m | |
height above valley floor or water | 24.4m |
Materials
deck |
reinforced concrete
|
---|---|
piers |
reinforced concrete
|
arches |
reinforced concrete
|
abutments |
reinforced concrete
|
piers on arch |
reinforced concrete
|
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Bridging the Gap. Early Bridges in New Zealand 1830-1939. Reed Books, Auckland (New Zealand), pp. 280. (2001):
- About this
data sheet - Structure-ID
20052125 - Published on:
16/01/2010 - Last updated on:
27/04/2017