General Information
Name in local language: | Cầu Tân Vũ – Lạch Huyện |
---|---|
Beginning of works: | 15 February 2014 |
Completion: | 2 September 2017 |
Status: | in use |
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
Road bridge |
Material: |
Prestressed concrete bridge |
Structure: |
main bridge: Haunched girder bridge |
Construction method: |
main bridge: Balanced cantilever method |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Construction method: |
approach viaducts: Precast segmental construction using launching gantry |
Location
Location: |
Hải Phòng, Vietnam |
---|---|
Coordinates: | 20° 48' 20.77" N 106° 47' 43.16" E |
Coordinates: | 20° 48' 25.44" N 106° 50' 51.31" E |
Technical Information
Dimensions
width | 16 m | |
total length | ca. 5 440 m | |
number of spans | 84 | |
eastern approach viaduct | ||
---|---|---|
length | ca. 500 m | |
main bridge | ||
length | ca. 500 m | |
western approach viaduct | ||
length | ca. 4 400 m |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Case Studies and Applied Products
Vietnam’s longest sea crossing bridge at Lach Huyen
The new Lach Huyen deep sea port near the city of Hai Phong in the Gulf of Tonkin is one of the most important infrastructure projects that is currently under construction in Vietnam. Lach Huyen will be the first international port in th ... [more]
Participants
Structural engineering
Co-contractor
External prestressing
Prestressing
Material supplier
Relevant Web Sites
- About this
data sheet - Structure-ID
20074161 - Published on:
10/11/2017 - Last updated on:
20/11/2017