General Information
Other name(s): | Viaduc du Tacon |
---|---|
Completion: | 1986 |
Duration of works: | 30 months |
Status: | in use |
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Construction method: |
Balanced cantilever method |
Structure: |
Haunched girder bridge |
Material: |
Prestressed concrete bridge |
Location
Location: |
Saint-Germain-de-Joux, Ain (01), Auvergne-Rhône-Alpes, France Châtillon-en-Michaille, Ain (01), Auvergne-Rhône-Alpes, France |
---|---|
Carries: |
|
Crosses: |
|
Part of: |
|
Next to: |
Tacon Viaduct
|
Coordinates: | 46° 9' 56.51" N 5° 45' 18.27" E |
Technical Information
Dimensions
total length | 321.60 m | |
span lengths | 25 m - 40 m - 55 m - 90 m - 80 m - 30 m | |
number of spans | 6 | |
bridge surface | 6 270 m² | |
bottom flange | width | 5.60 m |
thickness | 0.20 - 0.55 m | |
deck | width | 9.75 m |
girder depth | 3 - 6 m | |
web thickness | 0.45 m | |
piers | height | 6 - 42 m |
Quantities
deck | concrete volume | 4 820 m³ |
prestressing steel | 185 t (38.4 kg/m³) | |
reinforcing steel | 554 t (115 kg/m³) |
Materials
deck |
prestressed concrete
|
---|
Participants
Owner
Client
Architecture
- Auguste Arsac (architect)
- Charles Lavigne (architect)
Structural engineering
Checking engineering
Contractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- A40 - Viaduc du Tacon. In: Travaux, n. 606 (January 1986), pp. 77.