0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Other name(s): Graaf Alardsingel Footbridge
Beginning of works: January 2012
Completion: December 2013
Status: in use

Project Type

Location

Location: , ,
Coordinates: 51° 51' 50.15" N    5° 51' 29.99" E
Show coordinates on a map

Technical Information

Dimensions

main span 60 m
total length 120 m
span lengths 30 m - 60 m - 30 m
number of spans 3
bridge surface 699 m²
abutments number 2
deck number of cells in box section 1
piers number 2

Cost

construction cost (without tax) Euro 4 000 000

Materials

deck steel
piers steel
abutments reinforced concrete

Participants

Owner
Design
Structural engineering
Contractor
Steel construction

Relevant Web Sites

Relevant Publications

  • Mallié, Matthieu / Ney, Laurent / Bols, Bart / Van Nimmen, Katrien / van den Broeck, Peter / De Roeck, Guido (2014): Two mass-tuned footbridges, Belgium. Presented at: Footbridge 2014 - Past, Present & Future, London, 16-18 July 2014.
  • About this
    data sheet
  • Structure-ID
    20067286
  • Published on:
    11/07/2015
  • Last updated on:
    15/01/2018
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine