0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Status: in use

Project Type

Location

Location: , , ,
Address: T-11
Coordinates: 41° 7' 22.52" N    1° 13' 9.94" E
Coordinates: 41° 7' 27.76" N    1° 12' 49.55" E
Coordinates: 41° 7' 29.82" N    1° 12' 42.09" E
Coordinates: 41° 7' 35.53" N    1° 12' 22.93" E
Show coordinates on a map

Technical Information

Dimensions

main spans 19.55 m - 28.51 m
on-center distance between girders 2.85 m
girder depth 1.25 m
walkway width 2.00 m

Cost

cost of construction Euro 2 960 000
cost of construction per m² Euro 1 200

Materials

approach viaducts reinforced concrete
cross beams steel
deck flooring glass-fiber-reinforced polymer (GFRP)
Vierendeel truss steel

Participants

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • Sobrino, Juan A. / Olmo, Arantxa / Pellegrini, Lara / Ferraz, Ricardo (2011): Design and Construction of Hybrid Steel and GFRP Footbridges. Presented at: 4th International Conference Footbridge 2011, Wroclaw, Poland, 6-8 July 2011.
  • Sobrino, Juan / Jordán, Javier / Ferraz, Ricardo (2014): Hybrid steel and GFRP footbridges. Presented at: Footbridge 2014 - Past, Present & Future, London, 16-18 July 2014.
  • Sobrino, Juan (2011): Light and Durable Steel-GFRP Pedestrian Bridges. Presented at: 35th Annual Symposium of IABSE / 52nd Annual Symposium of IASS / 6th International Conference on Space Structures: Taller, Longer, Lighter - Meeting growing demand with limited resources, London, United Kingdom, September 2011.
  • About this
    data sheet
  • Structure-ID
    20062041
  • Published on:
    09/10/2011
  • Last updated on:
    23/10/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine