General Information
Project Type
Structure: |
Half-through arch bridge |
---|---|
Function / usage: |
Road bridge |
Construction method: |
Cantilever construction using temporary cable-stays |
Material: |
Reinforced concrete bridge |
Location
Location: |
Strömstad, Västra Götalands län, Sweden Sponvika, Viken, Norway |
---|---|
Next to: |
Old Svinesund Bridge (1946)
|
Coordinates: | 59° 5' 40.04" N 11° 15' 7.57" E |
Technical Information
Dimensions
total length | 704 m | |
arch | rise | 30 m |
arch span | 247 m | |
deck | height above valley floor or water | > 90 m |
total width | 28 m |
Materials
arch |
reinforced concrete
|
---|
Participants
Structural engineering
- Bilfinger Berger SE
-
Meyer + Schubart
- Ralf Schubart (engineer)
Construction engineers
- IWS Beratende Bauingenieure (launching nose)
Checking engineering
-
Leonhardt, Andrä und Partner
- Holger S. Svensson (checking engineer)
Contractor
Steel construction
Subcontractor
Stay cables
Stay cable steel supplier
Bearing installation
Construction supervision
Project management
Concrete repair
Inspection services
Relevant Web Sites
Relevant Publications
- Ein Bogen spannt von Schweden nach Norwegen. In: Bauingenieur, v. 80, n. 4 (April 2005), pp. 188-206. (2005):
- Brückenschlag zwischen Schweden und Norwegen. In: Beton- und Stahlbetonbau, v. 99, n. 5 (May 2004), pp. 411.
- Close Call. In: Bridge Update, n. 42 (March 2004), pp. 1.
- Mit kühnem Schwung von Schweden nach Norwegen. In: Frankfurter Allgemeine Zeitung (F.A.Z.), "Technik und Motor", 01.06.2004. :
- Slender arch spans international borders. In: Bridge Design & Engineering, v. 10, n. 34 (1st Quarter 2004), pp. 10-11. (2004):
- About this
data sheet - Structure-ID
20004797 - Published on:
04/09/2002 - Last updated on:
21/04/2016