Suvarnabhumi Airport Passenger Terminal Complex
General Information
Completion: | 2004 |
---|---|
Duration of works: | 1097 days |
Status: | in use |
Project Type
Function / usage: |
Airport terminal building |
---|---|
Structure: |
Membrane structure |
Material: |
Steel structure |
Location
Technical Information
Dimensions
width | 111 m | |
length | 444 m | |
number of floors (above ground) | 7 | |
gross floor area | 563 000 m² |
Quantities
structural steel | 77 000 t | |
concrete volume | 122 000 m³ |
Materials
building structure |
steel
|
---|
Participants
Architecture
Structural engineering
Consulting engineers
Co-contractor
Subcontractor
Building services engineering
Electrical engineering
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Hochleistungs-Membranen für Bangkok. Einzigartige Dachlösung von Hightex. In: [ Umrisse ], v. 5, n. 1 ( 2005), pp. 36-37.
- Passagier-Terminal-Komplex Suvarnabhumi International Airport Bangkok. In: Detail - Zeitschrift für Architektur + Baudetail, v. 46, n. 7-8 ( 2006), pp. 810.
- Un portique multifonction. In: Sols et Structures, n. 220 ( 2004), pp. 19.
- Suvarnabhumi Airport. In: Structural Engineering International, v. 19, n. 1 (February 2009), pp. 6-11. (2009):
- Suvarnabhumi International Airport Bangkok - Engineering, Konfektion und Montage des Membrandachs. In: Detail - Zeitschrift für Architektur + Baudetail, v. 46, n. 7-8 ( 2006), pp. 824. (2006):
- About this
data sheet - Structure-ID
20014867 - Published on:
27/12/2004 - Last updated on:
29/04/2021