General Information
Completion: | 2015 |
---|---|
Status: | in use |
Project Type
Structure: |
Haunched girder bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Structure: |
Box girder bridge |
Material: |
Prestressed concrete bridge |
Construction method: |
Balanced cantilever method |
Location
Location: |
Studenci, Federation of Bosnia and Herzegovina, Bosnia and Herzegovina |
---|---|
Coordinates: | 43° 9' 34.43" N 17° 38' 28.43" E |
Technical Information
Dimensions
main span | ca. 120 m | |
total length | 555 m | |
deck width | 2 x 12.4 m | |
height above valley floor or water | 81 m |
Case Studies and Applied Products
Bridges in Bosnia: High-performing wagon for high speed
In the future, travelling between Budapest and Southern Dalmatia will take less time thanks to the Pan-European Corridor Vc. Numerous tunnels and bridges are erected along the 397 km route through Bosnia owing to the difficult topography ... [more]
Corridor Vc: High-performing wagon for high speed
In the future, travelling between Budapest and Southern Dalmatia will take less time thanks to the Pan-European Corridor Vc. Numerous tunnels and bridges are erected along the 397 km route through Bosnia owing to the difficult topograph ... [more]
Participants
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20068131 - Published on:
08/12/2015 - Last updated on:
09/07/2017