General Information
Project Type
Structure: |
Through truss bridge |
---|---|
Function / usage: |
Railroad (railway) bridge |
Material: |
Metal bridge |
Location
Location: |
Strasbourg, Bas-Rhin (67), Grand-Est, France Kehl, Ortenaukreis, Baden-Württemberg, Germany |
---|---|
Crossed: |
|
Replaced by: |
Strasbourg-Kehl Railroad Bridge (1956)
|
Technical Information
Dimensions
total length | 177 m | |
number of spans | 3 |
Chronology
1941 — 1942 | Repaired. |
---|---|
1944 | Destroyed again. |
1945 | Again repaired for single track use. |
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Der Bau eiserner Brücken im Südwesten Deutschlands 1844 bis 1889 - Vom Gitterträger zum Fachwerk (Teil 3). In: Stahlbau, v. 81, n. 3 (March 2012), pp. 233-242. (2012):
- Les grands ponts du monde: Ponts remarquables d'Europe. Brissaud, Poitiers (France), pp. 59. (1990):
- Le rail en France - Le Second Empire [Tome 2]. 1858-1863. Edition à compte d'auteur François Palau, Maguy Palau, 7 rue Erard, 75012 Paris, Paris (France), pp. 123-125. (2001):
- Zeugin der Geschichte. Die Alte Weichselbrücke in Dirschau. Kaiserslautern (Germany). :
- About this
data sheet - Structure-ID
20008265 - Published on:
15/02/2003 - Last updated on:
05/02/2016