0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1935
Completion: 1940
Status: in use

Project Type

Structure: Cantilever truss bridge
Function / usage: Road bridge
Material: Steel bridge

Awards and Distinctions

Location

Location: , ,
Crosses:
  • Brisbane River
Coordinates: 27° 27' 49.68" S    153° 2' 9.60" E
Show coordinates on a map

Technical Information

Dimensions

main span 281.6 m
total length 1 375 m
clearance 30.4 m
length of drop-in span 94 m

Quantities

structural steel 11 990 t
concrete volume 38 230 m³
reinforcing steel 1 625 t

Cost

cost of construction Australian dollar 3 227 416

Materials

truss steel

Chronology

24 May 1935

First sod is turned by Premier W. Forgan Smith.

6 July 1940

Opening.

Participants

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20004718
  • Published on:
    30/08/2002
  • Last updated on:
    07/05/2020
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine