General Information
Other name(s): | Hangatahua Bridge |
---|---|
Completion: | 1930 |
Status: | in use |
Project Type
Structure: |
Vaulted arch bridge |
---|---|
Function / usage: |
Road bridge |
Material: |
Reinforced concrete bridge |
Location
Location: |
Okato, Taranaki, New Zealand |
---|---|
Address: | SH45 |
Coordinates: | 39° 11' 30.12" S 173° 51' 50.94" E |
Technical Information
Dimensions
span | 19.5 m |
Materials
arch |
reinforced concrete
|
---|
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Bridging the Gap. Early Bridges in New Zealand 1830-1939. Reed Books, Auckland (New Zealand), pp. 272. (2001):
- About this
data sheet - Structure-ID
20052117 - Published on:
16/01/2010 - Last updated on:
27/04/2017