General Information
Other name(s): | Stolmasund Bridge |
---|---|
Completion: | 1998 |
Status: | in use |
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
Road bridge |
Construction method: |
Balanced cantilever method |
Structure: |
Haunched girder bridge |
Material: |
Prestressed concrete bridge Structurae Plus/Pro - Subscribe Now! |
Location
Technical Information
Dimensions
main span | 301 m | |
total length | 467 m | |
span lengths | 94 m - 301 m - 72 m | |
number of spans | 3 | |
deck | deck depth | 3.500 - 15.000 m |
deck width | 9.000 m |
Quantities
structural steel | 1 850 t | |
concrete volume | 11 500 m³ |
Materials
superstructure |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
Participants
Owner
Structural engineering
Contractor
Prestressing
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Rekordspannweiten norwegischer Spannbetonbalkenbrücken. In: Bautechnik, v. 77, n. 1 (January 2000), pp. 72-73. (2000):
- Stolma Bridge, Norway. In: Structural Engineering International, v. 9, n. 2 (May 1999), pp. 100-102. (1999):
- About this
data sheet - Structure-ID
20001760 - Published on:
18/08/2001 - Last updated on:
05/02/2016