0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Name in local language: Mainbrücke Stockstadt
Beginning of works: 1987
Completion: 1991
Status: in use

Project Type

Location

Location: , ,
, , ,
Carries:
  • Autobahn A3
Crosses:
  • Main River
Part of:
Next to: Stockstadt Bridge (1958)
Coordinates: 49° 59' 26.42" N    9° 3' 51.01" E
Show coordinates on a map

Technical Information

Dimensions

main span 78 m
total length 361 m
vertical navigation clearance 6.70 m

Cost

cost of construction German Mark 36 000 000

Materials

deck prestressed concrete
piers reinforced concrete

Chronology

1988

During launching, one of the spans collapses killing one worker.

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20013092
  • Published on:
    27/08/2004
  • Last updated on:
    11/12/2017
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine