General Information
Completion: | 1900 |
---|---|
Status: | in use |
Project Type
Function / usage: |
Road bridge |
---|---|
Structure: |
Cantilever truss bridge |
Material: |
Steel bridge |
Location
Location: |
Tver, Tver (oblast), Central Federal District, Russia |
---|---|
Crosses: |
|
Coordinates: | 56° 51' 52" N 35° 53' 59" E |
Technical Information
Dimensions
span lengths | 47 m - 93 m - 47 m | |
number of spans | 3 | |
deck | width | 9 m |
walkway width | 2 x 2.25 m |
Materials
truss |
steel
|
---|
Participants
Architecture
- V. Tochinsky (architect)
- L. Mashek (architect)
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20023602 - Published on:
12/10/2006 - Last updated on:
05/02/2016