0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: August 2013
Completion: 31 October 2014
Status: in use

Project Type

Location

Location: ,
Crosses:
  • Keelung River
Coordinates: 25° 4' 35.10" N    121° 39' 44.76" E
Show coordinates on a map

Technical Information

Dimensions

main span ca. 126 m
total length ca. 270 m
deck width 8.6 - 9.1 m
pylon height 70 m

Cost

cost of construction 210 000 000

Materials

pylon steel
deck steel

Participants

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20084492
  • Published on:
    14/01/2023
  • Last updated on:
    17/01/2023
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine