0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Completion: 8 November 1954
Status: demolished

Project Type

Awards and Distinctions

1954 Honorable Mention  

Location

Location: , ,
Address: I-77 (West Virginia Turnpike)
Carried: Interstate 64
Interstate 77
Coordinates: 38° 8' 5.05" N    81° 24' 23.87" W
Show coordinates on a map

Technical Information

Dimensions

span lengths 2 x 25.91 m - 77.42 m - 153.62 m - 76.2 m - 14.94 m
number of spans 6

Cost

cost of construction United States dollar 1 302 146.21

Materials

piers reinforced concrete
truss steel
abutments reinforced concrete

Participants

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20080828
  • Published on:
    28/03/2021
  • Last updated on:
    28/03/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine